Local road, water and electricity disruptions: Water cuts in Icod area from 10pm tonight

Local road, water and electricity disruptions: Water cuts in Icod area from 10pm tonight

Updated 19 April: Icod de los Vinos Ayuntamiento has announced that water supply will be affected from 10pm tonight as Icodemsa works on repairs in the following areas:

C/. Los Reyes, C/. El Durazno, C/. Siervo de Dios, C/. Infanta Isabel, C/. Santa Barbara, C/. Antonio Gonzalez Gonzalez, C/. El Sol, C/. Key Muñoz, C/. Julio Arencibia, C/. San Felipe, C/. El Calvario, C/. Los Chorros, C/. San Agustin, C/. Francisco Miranda, C/. La Cruz, C/. Los Coches, Paseo Mencey Icodem, C/. La Asomada, Cn/. El Beco, C/. San Sebastian, C/. Rambla Perez del Cristo, Avda Canarias, C/. Hercules y Derivaciones, C/. Las Angustias, C/. Arcipreste Ossuna, Urb. La Magalona, Avda 25 de Abril, Las Granaderas, Calzada Alzola, Las Barandas, La Hurona, and Parte Baja de Playa San Marcos.

Updated 17 April: Güímar Ayuntamiento has announced that Endesa works will cause cuts to the electricity supply on Tuesday, 24 April, between 8.30 and 10.30am. Areas affected are:

C/ Barranco, C/ Baranquillo Camino Real, C/ Baranquillo de San Juan, C/ Camino El Barranco, Cn/ Fregenal, C/ Guaza, C/ Hoya Don Anselmo, Cn/ La Caseta, C/ de la Libertad, C/ Lomo de la Cruz, C/ Lomo del Grillo, C/ Lomo del Medio, C/ Lomo Grande Abajo, C/ Lomo Grande Arriba, C/ Lomo Grillo Abajo, C/ Lomo Grillo Arriba, C/ Los Lomitos, Av/ Pedro Guerra Cabrera, Cn/ Real, C/ San Antonio de Texas, Cr/ General del Sur, Bc/ Guaza, Cj/ Lomito, Cr/ Caseta,  Cn/ La Mendoza.

Updated 16 April: Arona Ayuntamiento has announced that Endesa maintenance works will cause cuts to electricity supply in the general Arona area on Tuesday next week, 24 April, between 11.30am and 1.30opm. The council’s list of streets and areas affected is:

C/Arenados, C/Cementerio (El), C/Chamorga, Cn/Chichia, Cr/General Camella Arona C-821, Cr/ General TF-51 C/ARENADOS, C/CEMENTERIO (EL), C/CHAMORGA, CN/CHICHIA, CR/GENERAL CAMELLA ARONA C-821, CR/ GENERAL TF-51 ARONA, CR/ GENERAL TF-51(ARONA-VILAFLOR), C/ LOS ASIENTOS, C/ MEJORA, C/ MONTAÑA CHAMORGA, C/ PILON EL CASCO),C/SINDICAL, C/ SITIO EL (CASCO), C/TUNEZ CR/ CAMELLA ARONA ARONA -LA SABINITA -ARONA-CN/DOMINGUEZ, CR/GENERAL LA CAMELLA ARONA, CJ/GONZALEZ – SABINITA ALTA, C/ LOS MAJANOS, CJ/ MAYAL, CN/ MENDEZ, C/ MONTAÑA FRIA, CN/ PICA MOLINO, C/ PICA MOLINOS, C/ SABINITA ALTA ARONA – MONTAÑA FRIA CN/ ACCESO, C/ ARENADO, C/ CEMENTERIO, C/ CERCADO GRANDE, CN/CHAMORGA, C/CHASAGUA, CN/ CHICHIA, CN/ CHO ROMAN, C/ CN CAMORGA, C/DOMINGUEZ, CN/ EL PILON, C/ EL SITIO, CR/ GENERAL, CJ/ GONZALEZ, CR/GRAL ARONA A LA CAMELLA, CR/ GRAL ARONA LA CAMELLA C-821, CN/ HOYA CHO LUCIANO, CJ/ JOSE EL DEL ROQUE, CN/ JOSE EL DEL ROQUE, CN/ LADERA AQUILON, CN/ LLANO DEL REY, CJ/ MESITA, C/ MOJONITO, CN/ MOJONITO, C/MONTAÑA CHAMORGA, C/ MONTAÑA FRIA, CR/ MONTAÑA FRIA-SABINITA ALTA, DS/MORRO NEGRO, C/PARQUE ADAN, CN/ REAL A VENTO, C/SABINITA ALTA.

Updated 11 April: Guía de Isora Ayuntamiento has announced that Endesa works will mean an electricity cut in Guía de Isora and Chío tomorrow, Thursday 12 April, between 8 and 10am, and 3 and 5pm.

Updated 28 March: Arona Ayuntamiento has announced that Endesa maintenance works will cause cuts to electricity supply in Valle San Lorenzo and Buzanada on Sunday 8 April between 8am and 1pm. The areas affected are:

Arona – Cr/ General Tf-66, Cn/ Tijarafe (Los Toscales),  Cr/ General Camella Arona C-821

Buzanada – Cj/ Abajadero, C/ Alba, C/ Apartadero, C/ Aurora, C/ Barranco Oscuro, C/ Barroso, C/ Benítez (Malpaso), C/Boneta, C/ Bruma, C/ Buril, C/ Cabaña, C/ Cabaña, Cj/ Cabrera, C/ Cairel, Ds/ Cambados, C/ Campeche, C/Cascabel, C/ Cerco (el), Cj Durazno, C/ Esquilón, C/ Foque, C/ Fortín, C/ Gamboa, Cr/ General Tf-66, Cr/ General Tf-657 (Buzanada Aldea), Cr/ Gral. Tf-66 (Cruz Guanche-Guaza), C/ Ildefonso Bello, C/ Jose Ramón Galván, C/ Junonia, Cn/ Llano del Callao C/ López Ruiz – Las Montañetas, Av/ Luciano Bello, C/ Lucio Rodriguez Gómez, C/ Mancera, C/ Martin González, C/ Meseta, C/ Montañeta, C/ Mosquera, C/ Pintores Canarios-Montañetas, C/ Quiebra la (Bco.Oscuro), C/ Ribazo, C/ rosaleda, C/ San José, C/ Servando, C/ Sin determinar, Cn/Tijarafe, C/ Toscales, Cn/ Vera del Cardón.

La Florida – C/ Concepción Plasencia

Valle de San Lorenzo – Cs/Abajo, Cj/ Altabaquitas, C/ Antonio Alonso, C/ Barranco (El), C/ Barranquera, C/ Barranquillo, C/ Beña, C/ Cabezada (La), C/ Cabo Abajo, Ds/ Cabo Arriba, Cj/ Cabo de Arriba, Cj/ Cabo del Valo, C/ Cáceres, Cn/ Cáceres, Cj/ Callejón Helenio, C/ Canal, C/ Cepa. C/Cercado Las Toscas , C/ Chacacharte, C/ Chíndia (dr), C/Cno La Fuente, C/ Colegio (El), C/ Concepción , C/ Cooperativa, C/ Corta, C/ Cruz del Guanche, C/ Culantro (El) Cj/ del Toscal, Cj/ El Fayal, C/ El Puente C/ Ele (La), C/ Elvira, C/ Era del Valo, Cj/ Espaldera (La), Fajana, C/ Figón, C/ Finca de Burgos, Cj/ Fuste , Cj/ Galicta, Cr/General Tf 822, Cr/ General Tr-28, Cr/ Gral. Tf-28, Cr/ Gral Tf-66 C/ Guanche-Guaza, C/ Hornito, Ds/ Hoya, Cn/ Hoya de Beña.

Updated 16 March: La Orotava Ayuntamiento has announced an interruption of electricity supply for Endesa works in the town on 27 March between 7.30 and 9.45am. Areas affected are C/. Araujo, C/. Balcon, C/. Calvario-La Orotava (El), C/. Carrera Escultor Estev, Pz/. Casañas, C/. Colegio, C/. Cologan, C/. Habanera, C/. Magistrado Barreda, C/. Nicandro Gonzalez Borges, C/. Quinta, C/. Sabino Berthelot Augier, C/. Santa Domingo, Cr/. TF2111 (Las Candias), C/. Tomas Zerolo, and C/. Viera.

Updated 14 March: Arona Ayuntamiento has announced a cut in the electricity supply in Las Galletas on Monday 26 March between 9am and 2pm. The streets affected will be:

C/Beleño, C/ Gavilan, Cr/ General Guargacho – Las Galletas, C/ Lucerna, C/ Rivazul, CR/ General F-652, Cr/ Guargacho – El Palmar, C/ Braulio Lorenzo, C/ Cañada Verde, C/ Floresta, Cr/ General Las Rosa, Cr/ Guargacho – El Palmar.

Updated 7 March: La Orotava Ayuntamiento has announced that there will be a water cut tonight from 11pm in the general supply in the Cañeño area for improvement works. The water company hopes to get the supply reconnected by 3am tomorrow morning.

Updated 28 February: Arona Ayuntamiento has postponed the intended electricity cut for today in El Fraile. A new date will be announced in due course.

Guia de Isora Ayuntamiento has announced that Endesa will be carrying out works requiring electricity cuts in Chio tomorrow, Thursday 1 March, between 7:00 and 9:30h and 15:00 and 17:00h.

Updated 27 February: Arona Ayuntamiento has announced that Canaragua will be working on drinking water supplies and therefore there will be cuts tomorrow, Wednesday 28 February, in Cabo Blanco between 1am and 6am, and in Golf Las Américas tomorrow between 8am and 3pm. Areas affected are:

Cabo Blanco: Abrigaño, Virgen de Guadalupe, Santa Isabel, San Fernando, Santa Ana and the Santa Rita & Cabo Blanco social housing.

Campo de Golf Las Américas: Landa Golf, Meandro, Laderas del Espejo, Arenales.

Drinking water deposits will be available for the public during these times. The council apologises for any inconvenience, and provides the helpline 900 100 157 for any enquiries.

Updated 26 February: Arona Ayuntamiento has announced electricity cut in El Fraile on Wednesday, 28 February between 9am and 2.30pm. Streets affected are:

C/Casiano, C/ La Esperanza, C/ Montaña caraba, C/ El Poris, C / Barchimbre, Urb. Aloe Sur, C/ Contreras, Av. Europa, C/ Fátima Villa Isabel, C/ Fuerteventura, C/ Garajonay, C/ José Vista El Mar, C/ Lagunetas, C/ Maretas, C/ Miguel Calcerrada, C/ Montaña Aguzada, C/ Montaña Caraba, C/ Montaña Pardela, C/ Orotava, C/ Punta del Caballo, C/ Salinas del Faro, C/ San Clemente C/ San Luis, C/ San Sebastián de La Gomera, C/ Taburiente, C/ Tagoror, C/ Paralela a La Gomera.

Updated 14 February: Arona Ayuntamiento has announced an electricity cut in Las Galletas on Tuesday 27 February between 3 and 4.30 pm. The cut will affect C/Albedro, C/Banano, C/Bejuco, C/Calamo, C/Cornical, C/Mimbre, C/Romeral, C/Sargatillo, and C/Sarmiento (Urb.Coromoto).

Updated 10 February: The Cabildo has announced that the TF-5 will be closed overnight tomorrow in both directions for works on the pedestrian overpass at Los Naranjeros. Works will start at 11pm with traffic diverted via Tacoronte and Guamasa.

Updated 5 February: Adeje Ayuntamiento says that due to works to improve the drinking water network in Playa Paraíso there will be a temporary cut in the tap water supply on Tuesday, 6 February between 8.30am and 3pm. The streets affected are C/ La Era, Avda Adeje 300, C/ El Aljibe, Las Galgas, C/ El Horno. Water company Entemanser say they will work to reconnect the supply as quickly as possible and also have a client information phone number 902 23 60 23

Updated 1 February: Arona Ayuntamiento has announced electricity cuts on Monday 5 February between 9am and 2.30pm in El Fraile. The streets affected are:

Ur. Fraile (C/ Fuerteventura), C/Casiano, C/ La Esperanza, C/ Montaña Caraba, C/ El Poris, C/ Punta Caballo, C/ Barchimbre, Urb. Aloe Sur, C/ Contreras, C/ La Esperanza, Av. Europa, C/ Fátima Villa Isabel, C/ Garajonay, C/ José Vista El Mar, C/ Lagunetas, C/ Maretas. C/ Miguel Calcerrada, C/ Aguzada, C/ Montaña Pardela, C/ Orotava, C/ Salinas del Faro, C/San Clemente, C/ San Luis, C/ San Sebastián de La Gomera, C/ Taburiente, C/ Tagoror, C/ Paralela a La Gomera.

Updated 29 January: Arona Ayuntamiento has announced cuts to drinking water supplies in Valle San Lorenzo for improvement works on the general network. The cuts will be between 8am and 12 noon this Wednesday, 31 January, and affect the following streets: Beña, Era del Balo, Trinidad, Cj. El Canal, Cooperativa, Isla de La Gomera, Cj. El Fayal, El Colegio, San Ismael, Juan Carlos Darías, and the TF28 (between numbers 138 & 172). The council apologises for any inconvenience and gives 900 100 157 as the number for any enquiries.

Updated 23 January: Guía de Isora Ayuntamiento has announced works by Endesa tomorrow, Wednesday 24 January, will cause electricity cuts in various streets in Playa San Juan, as well as the carretera general that connects with Guía de Isora (TF-463 and the road between Piedra Hincada and Tejina). The cut is expected to last between 8.30 and 10.30am.

Updated 16 January: The works which required the TF5 to be closed overnight have been completed successfully, the Cabildo has said. The authority has released this video of the works as they progressed last night.

Updated 13 January: The Tenerife Cabildo has announced that part of the TF5 will be closed on Monday night for two 41m prefabricated beams which will span the walkway at Los Naranjeros (Tacoronte). The proposed works are dependent on weather conditions, but assuming they go ahead as planned, will see two large cranes operating in the carriageways in both directions. The works are planned to take place between 9.30pm and 6am on Tuesday morning, and in the meantime, traffic will be diverted via the TF-152.

Updated 10 January: La Orotava Ayuntamiento has announced electricity cuts this Sunday, 14 January. The council says that various areas will be affected with various short cuts in order for maintenance works to be carried out. A map has been supplied HERE showing the areas affected.

Updated 9 January: Adeje Ayuntamiento has announced a cut to water supplies this Thursday 11 January in the wider El Madroñal area. The cut is for complicated works at a concreted-in junction box with multiple pipes and should see water off from 8.30am to 6pm. The areas affected are detailed clearly HERE.

Updated 8 January: Puerto de la Cruz Ayuntamiento has announced that Endesa will be carrying out maintenance works requiring electricity cuts on Tuesday, 16 January, between 4.30 and 9.35am. The cuts will affect the following streets:

– Calle Dr. Celestino González Padrón
– Camino Carrasco
– Camino Los Orovales
– Carretera del Este
– Carretera General Puerto Cruz – Las Arenas
– Camino Lazo
– Calle La Quinta
– Calle Sabina
– Calle Tarajal
– Paseo Tarajal
– Calle Veguetas

 Updated 5 January 2018: In addition to the last announcement of an electricity cut on Wednesday 10 January between 8.30am and 1.30pm in the Costa del Silencio area affecting Urb. Chayofita, Av. José Antonio Tavío, C/San Miguel, C/Sirio, Urb. Ten-Bel (C/Minerva) and C/Trebol, Arona Ayuntamiento has now also announced one between 9am and 2pm on Tuesday 9 January in Las Galletas: the street affected is Calle Morro Cubas.

Updated 28 December 2017: Arona Ayuntamiento has announced an electricity cut on Wednesday 10 January between 8.30am and 1.30pm in the Costa del Silencio area affecting Urb. Chayofita, Av. José Antonio Tavío, C/San Miguel, C/Sirio, Urb. Ten-Bel (C/Minerva) and C/Trebol.

Updated 27 December: Arona Ayuntamiento has announced an electricity cut a week today, Wednesday 3 January between 8 and 11am in the following streets of Las Rosas and La Estrella:

C/Acorán, C/Arrieta, C/Bahía del Galgo, C/ Cumbre nueva, C/Famara, C/Isla Verde, C/Jameos, C/Mata Gorda, C/Orzola, C/Playa Blanca, C/Rubicón, C/Salinas del Janubio, C/Teguise, C/ Salinas del Janubio, C/Astron, C/Boreal, C/Austral, C/Cefeo, C/Saturno, C/Los Jameos, C/Júpiter, C/Ofluco, C/Virgen del Paso and C/Zodiaco.

The council has also announced an electricity cut on Tuesday 9 January between 9am and 2pm in Las Galletas. The following streets will be affected:

C/Arena, C/Bélgica, C/Cándida Peña Bello, C/Casiano Alfonso, C/Central, GR/Eventuales C/Los Fundadores, C/José Miguel Galván Bello, C/Los Pozos, C/Luis Álvarez Cruz, C/María Alayón Hernández (Partera), C/Morro Cubas, Av. Príncipe Felipe, C/San Claudio, C/Sol del Sur, C/Varadero, C/Venezuela and C/Villamar.

Updated 18 December: The Tenerife Cabildo has ordered the closure of the TF-1, direction from Santa Cruz, between Fañabe and the CC Gran Sur. The closure, to carry out roadworks, will be overnight tonight, from 10pm until 6am tomorrow, Tuesday 19 December. Diversions will be in place via Calles Budapest, Peralillo and Dublín (see map below). Drivers are advised to drive with caution.

13 December: Canaragua has announced a cut to drinking water supplies for routine maintenance work in Guargacho overnight tonight, 13-14 December, between 1 and 8am. The areas affected are Camino Los Gorones, Guargacho, Camino Guargacho Bajo, Polígono Industrial de Costa del Silencio – Guargacho, and the Virgen del Carmen social housing. Drinking water dispensers will be available. More information on 900 100 157.

And Santiago del Teide Ayuntamiento has announced that there will be cuts to the water supply in the whole of Los Gigantes on Friday, 15 December, between 9am and 2pm. The cut is due to improvement works being carried out by Entemanser.

Updated 22 November: Puerto de la Cruz Ayuntamiento has announced a water cut from 11pm tonight in the general supply in the Carretera del Durazno. The council says it hopes the supply will be back on it by 3am.  Areas affected will be San José, La Paz, Tucán, El Tope, and El Durazno.

Updated 13 November: Canaragua and Arona Ayuntamiento have announced that there will be a cuts to drinking water supplies for maintenance works this Wednesday, 15 November. The areas where residents could be affected are Guargacho and the Virgen del Carmen estate. Interruptions are expected to be between 7am and 1pm, and drinking water dispensers will be available for residents. Any enquiries should be made to the council on 900 100 157.

Updated 6 November: Icod de los Vinos Ayuntamiento has announced water cuts for maintenance between 10am and 7pm tomorrow, Tuesday 7 November, in the following areas:

-Camino Llanito Perera
-Camino La Labranza
-Calzada El Pino
-Camino La Airosa
-Camino Penichet
-Calle Los Agricultores
-Camino La Palma (por Santa Bárbara)
-Camino Lomo de la Cruz (por Santa Bárbara)
-Camino Tajinaste
-Camino Bencomia
-Camino Julan
-Caserío La Tablada
-Carretera Santa Bárbara
-Camino Basta
-Camino Hoya Garcés (por Santa Bárbara)
-Lugar de La Mancha (trasera Electroauto Galipan)
-Camino Cabeza del Negro
-Camino Los Canarios (por Santa Bárbara)

Updated 19 September:  Guía de Isora Ayuntamiento has announced water cuts for network improvements between 8 and 10am tomorrow morning, Wednesday 20 September, in the whole of Piedra Hincada. The council apologises for any inconvenience caused.

Updated 15 September: Guía de Isora Ayuntamiento and Unelco Endesa have announced a network fault causing cuts to the electricity supply in some parts of the municipality. Areas affected are Piedra Hincada, Agua Dulce and Chío, though customers in other areas could find their supply affected. The company is working to resolve the incident, apologises for the inconvenience, and directs enquiries to 900 85 08 40.

Updated 13 September: Guía de Isora Ayuntamiento has announced water cuts in Alcalá tomorrow for maintenance works on the public supply network. The water will be cut off in the whole of Alcalá between 8 and 9am. The council apologises for any inconvenience caused.

Updated 5 September: Endesa and Arona Ayuntamiento have announced electricity cuts for maintenance works to the public network in Cho on Friday, 15 September, between 9am and 1pm. The areas affected are:

cn/Los Parlamentos, c/Bardena, c/Bolecos, c/Chimbesque, c/Cho, ur/Cho II, c/Envolvente, cr/TF-655 Guaza-Chafiras, c/Infanta Elena, c/Levante, ur/Parque la Reina, Polígono Industrial Cho II, c/Reina Sofía, c/Tejuela, c/ la Tajadera.

Updated 24 August: Canaragua and Arona Ayuntamiento have announced widespread water cuts for improvements works from 11.30pm tonight until 7am tomorrow morning in Valle San Lorenzo. The streets affected are:

Chindia, Callejón del Toscal, Cáceres, La Galga, Virtud, Cm El Roquete, La Traviesa, Callejón Obenque, Callejón Narguile, Libertad, Callejón La Fajana, Callejón Figón, Callejón Hoya Del Toscal, Toscal Los Herreros, Callejón Lomito Del Toscal, Carretera Gral TF-28, Colleja, Juana Gónzalez Gónzalez, Avenida Valle San Lorenzo, Plaza Valle San Lorenzo, La Ele, Barranquera, La Imaculada, La Cabezada, El Roblón, Angarillas, Morro Lera, Era Las Mozas, Vieja, Casas De Abajo, Los Palmeros, Llano Mora, Barranco, Nuestra Señora De La Encarnación, Callejón Las Anselmas, Vera De Arriba, La Concepción, Vera De Abajo, José García, Cm Atajo Elvira, Corta, Callejón Galicia, Chacacharte, Era Del Valo ,Cabo De Abajo, Rafael Adrián, Las Lajas, Rosa Cabo, Vera Del Barranco, Calamón, Las Piteras, La Leña, Panadería, Hornija, Candela, Isla De La Palma, Cruz Del Guanche, Rosas Del Guanche, Lampazo, Sargaza, Callejón El Hornito, Las Flores, Solana, Arguamul, Carretera Gral TF-66.

Updated 16 June: Canaragua and Arona Ayuntamiento have announced water cuts for improvements works overnight next Tuesday-Wednesday (20-21 June) between 23.50pm and 7am. The areas affected are Guaza, Ctra. Gral. TF-66 (Guaza-Las Galletas), Crta. Gral. TF-653 (Cañada), Calle Arsenio Rguez, Finca La Estrella, Estrella del Sur amd El Fraile.

Updated 25 April: The council has announced electricity cuts for maintenance tomorrow, 26 April, in the Puerto Santiago and Los Gigantes areas between 8.30am and 1.30pm. The areas affected are C/ Adelfas, Pz Bouganvilla, C/ Flor de Pascua, C/ Gigantes, C/. Hibisco, Avda José González Forte, PB Marinero, Avda Marítima, C/ Pino, C/ Tamara, Cj Tarajal, Pj Tulipan.

Updated 10 April: Adeje Ayuntamiento has announced that Cabildo roads department works will require the closure of the main Adeje town slip road off the TF1, junction 79A (heading from Los Cristianos towards Adeje). The council says that the junction will be closed between 9am and 7pm on Monday to Wednesday next week, 10-12 April. The Cabildo has advised drivers to use Junction 78 from Fañabe to access the town, as in this photo (click to enlarge).

In addition, Adeje town will be in full Easter mode on Thursday and Friday for the passion play (see HERE), which will mean significant disruption to the town’s traffic. Anyone going to the Pasión would be well advised to get a taxi or go by bus.

Updated 5 April: Endesa and Arona Ayuntamiento have announced electricity cuts for maintenance works to the public network in Arona town next Tuesday, 11 Abril, between 3 and 5pm. The areas affected are  C/ Antonio Alfonso Sierra, C/ Calvario, C/ Cruz (La), and C/ Mazape.

Updated 22 March: Canaragua and Arona Ayuntamiento have announced water cuts for improvements works in Las Galletas tomorrow, 23 March, Cristianos from 11.30pm. The water should be off until around 7am Friday morning. As always, there will be water tanks for the public’s use while supplies are disconnected.

Updated 16 February: Canaragua and Arona Ayuntamiento have announced water cuts for improvements works in Los Cristianos from 11.30pm tonight in the area shown in the following image. The water should be off until around 7am tomorrow morning.

Updated 14 February: Canaragua and Arona Ayuntamiento have announced water cuts in El Fraile for maintenance works on the supply network this Wednesday, 15 February from 11.30pm until around 7am Thursday morning.

Updated 13 February: Canaragua and Arona Ayuntamiento have announced water cuts in Los Cristianos for maintenance works on the supply network this Wednesday, 15 February, between 8am and 3pm. The streets affected are Av Juan Carlos I, Eloy García, Montaña Chica, Valle Menéndez, Ps Sabina, La Caldera, Ps Aquilino and Av Londres.

Updated 11 January 2017: Monday, 16 January, 9-11 am – electricity cuts in El Mojón, Ctra. El Mojón, C/ Zona El Mojón.

Updated 18 November: Endesa and Arona Ayuntamiento have announced electricity cuts for maintenance works to the public network in Guargacho, Costa del Silencio and Cho next Tuesday, 22 November, between 8am and 10am. The areas affected are:

Guargacho: C/ Antón Cojo, C/ Antonio Bello, C/ Archiles, C/ Delfina Hernández, C/ Don Claudio, C/ Edén, AV/ Eugenio Domínguez Sierra, CR/ General a Las Galletas, CR/ General Guargacho Las Galletas, CN/ Los Gorones, CR/ Gral. Guargacho – Costa del Silencio, PG/ Guargacho, C/ La Verada, C/ Laurisilva, C/ Mago, C/ María Rosa – Oroteanda Baja, AV/ Norte, C/ Ntra. Sra. de Candelaria, C/ Ntra. Sra. de Guadalupe, C/ Ntra. Sra. del Carmen, C/ Ntra. Sra. del Rosario, C/ Oasis, C/ Paraíso Tropical, CN/ Finca Fondos de Chineja y CR/ General Las Galletas.

Costa del Silencio: C/ Arcilla, CR/ General TF-652, C/ Olimpia, CR/ Polígono Industrial Costa del Silencio.

Cho: C/ Los Fondos.

Updated 1 November: Canaragua and Arona Ayuntamiento have announced water cuts in Los Cristianos for maintenance works on the supply network on Thursday, 3 November, between 8am and 3pm. The streets affected are:

Av Chayofita and surrounds, Roque de Jama, La Montaña, Montaña Chica, Montañita, Cristobal Colón, Eucaliptus, El Nido, Barrio Nuevo and La Colina.

Updated 18 October: Endesa and Arona Ayuntamiento have announced electricity cuts for maintenance works to the public network in Costa del Silencio and Guargacho this Thursday, 20 October, between 8am and 2pm. The areas affected are:

Costa del Silencio: C/ Hipotenusa, C/ Olimpia, Cr/ Polígono Industrial Costa del Silencio.

Guargacho: C/ Ángel Guimera, C/ Antonio Bello, C/ Antonio Machado, C/ Archiles, C/ Bediesta, C/ Benito Pérez Galdós, C/ Camilo José Cela, C/ Cervantes, C/ Delfina Hernández, C/ Edén, C/ Ferretería, C/ Flor del Sur, C/ Garajonay, CR/ General a Las Galletas, CR/ General Guargacho Las Galletas, CR/ Guargacho Costa del Silencio, C/ Guargacho, C/ Guayadeque, C/ Hermanos Álvarez Quintero, C/ La Dehesa, C/ La Verada, C/ Laurisilva, Av/ Norte, C/ Oasis, C/ Paraíso Tropical, C/ Pedro García Cabrera, C/ Pizarro, C/ Quinta, C/ Rafael Alberti, C/ Rosalía de Castro, C/ Simón Bolívar, C/ Sol del Sur, C/ La Victoria, C/ Villa Naz, C/ Tajader, CN/ Finca Fondos de Chineja y CR/ General Las Galletas.

Updated 12 April: The Canarian Government roads department has announced that final surfacing works are being carried out over the next three weeks on the TF1 beween the Erques junction and Santiago del Teide. The works have started this morning and will be carried out in phases as follows. Works should be completed by 2 May.

1. Between the Guía de Isora and Chio junctions, with traffic diverted onto the TF82, the original road between Adeje and Santiago del Teide over 11, 12 and 13 April.

2. Between the Guía de Isora and Tejina-Piedra Hincada junctions, with traffic diverted onto the TF82 over 14, 15 and 16 April.

3. Between the Tejina and Erques junctions, with traffic diverted onto the TF82 on 18 April.

4. In addition to the final surfacing of the TF1, the works will also include the Fonsalia spur access and subsurfacing theBicho tunnel between 18 and 22 April.

5. Between the Chio and Santiago del Teide junctions, 29 April to 2 May, during which the Bicho tunnel will be closed. Again the TF82 will serve for diverted traffic.

The Canarian Government’s Consejería de Obras Públicas y Transportes apologises to residents of the areas affected and to drivers for any inconvenience caused by the works. The authorities ask the public to cooperate and take notice of temporary road signs during this period.

Updated 19 February: More water supply cuts have been announced for Playa de Las Américas from 8am until around 3pm on Monday, 22nd. Again, Canaragua apologises for the inconvenience, which is to carry out works on the general supply network to improve the overall service. The company says that water reservoirs will again be available for those without tap water while works are ongoing.

Updated 17 February: In addition to today’s cuts (as below) to the water supplies in Arona, the council has announced more tomorrow, Thursday 18th, in Playa de las Américas. The whole area is set to be affected between 8am and 3pm, and Canaragua apologise for the inconvenience, saying that they are working to improve the network, and that water reservoirs will be available for those without tap water while works are ongoing.

Updated 16 February 2016: Arona Ayuntamiento has announced that Canaragua will be cutting domestic supplies tomorrow, Wednesday 17 February, between 8 am and 2pm for works to the network. The following areas will be affected: Buzanada, Los Migueles, Llanos de Guaza, Ctra. Gral. TF66 Buzanada-Guaza, Cho, Los Parlamentos, Los Fondos Quemada, Ctra. Gral. TF655 Guaza-Las Chafiras, Cañada Blanca, Cañada Verde, Malpaso, Los Bebederos, and Benítez. The company has supplied the following map of the general area which will be affected, and says that it will try to minimise the disruption and complete the works as soon as possible. Drinking water tanks will be available in the affected area. For any further information, call the customer number 900 100 157.

 

zona afectada

22 September 2015: Canaragua and Arona Ayuntamiento have announced a fairly wide range of water cuts in the municipality tomorrow, 23 September, between 8am and 2pm. They apologise in advance for the inconvenience, but say the works are to carry out improvements in the drinking water supply network. Mainly affected are the general Cho-Guaza-Las Galletas-Las Rosas-Parque de la Reina areas, specifically:

Calles Braulio Lorenzo, San Mauro, Arrayan, Carretera Gral. TF 652, TF 653, TF655 y TF 66, Arsenio Rodríguez, Palmeral, Los Geranios, Imada, Cm Toronjil, Codeso, Lentisco, Barbuzano, Las Rosas, Dorada, Suárez, Del Paleque, Estrecha, Barroso, Compos, Astran, Cenit, Júpiter, Celeste, Saturno, Boreal, Ofluco, Zodiaco, Aroma, San Mateo, Abdón Rocha, Los Nardos, Guayarmina, Mtña de Cho, Zarcera, Luquete, Alerce, Cotanda, Cm Marojo, Tamarco, Ganigo, Naveta, Tabona, Lomo Negro, Tahuya, Volcán de Timanfaya, Taoro, Volcán de San Antonio, Cm Los Vivitos, Cm Los Balitos, Cho, Envolvente, Cm Cañada-Fondos, Cm Cañada-Cho, Las Piletas, Los Migueles, Cm Las Piletas de Cho, Cm Nuevo, Cm Roque Abejera, Los Parlamentos, Cm Los Fondos Quemada y Mazape.

 

 

 

1 Comment

  1. Hi, does any one knows what’s the story with drinking water shortage in Costa Del Silencio??

Leave a Reply

Your email address will not be published. Required fields are marked *